Hi and welcome to my second media blog which will focus on the A2 part of the course so all posts relevant to it will be posted here.
Monday, 14 November 2011
Final Project - Filming on Monday 14th November
Today I filmed some of the footage need for my trailer. It was the present day scene of Matt and Gabriel in the alleyway which acts as the "spine" for the trailer by acting as the narrative and allowing the other scenes to be played in between the present scenes. Overall, the filming went well with most of the scenes needed being shot and many different takes done to avoid any problems or mistakes with the footage. Me and Craig went out to the location and shot the footage ourselves with each alternating controlling the camera when the other was acting. The quality of the footage is decent and the sound is much clearer and of better quality then my other footage which is vital as the dialogue will actually be used in these particular scenes. I will be posting the raw footage soon along with the log sheet of the shots to document the filming done to show the full details of each shot and which will be used for the trailer with a description as well of why they are being used in the trailer.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment